Session log — introducing the epic layer (September 2026)

What changed on 2026-09-07/08, in order, and why. Kept because the reasoning is the expensive part and several of these choices were corrections to earlier ones.

For how the result works, see epic-layer.md. For where it is going, see autonomy-roadmap.md.


Starting point

A review of the architecture guidance (PR #1146) had found that 17 of 22 awaiting-design issues were already answered — the agent had proposed, nobody had replied. That reframed the problem: the bottleneck was permission, not capability. It also found contradictions that only appear when related features are read together, which is what led to the epic layer.

What was built

1. Feasibility, verified before building

Two facts decided the whole approach:

  • No DoR workflow reads parent/child relations. Grepped every dor-*.yml and dor_*.sh: zero references. So a hierarchy could be added without touching the pipeline.
  • dor-triage fires only on enhancement/bug (dor-triage.yml:27-28). So epics without those labels trigger nothing — no board add, no AI interview, no tokens.

Both held. Every agent run on an epic concluded skipped.

2. Bottom-up: 7 epics over existing features

1101–#1107, covering 32 features, each with a Fortigi-shaped body (doelstelling, Key Result,

meetmoment, acceptatiecriteria, afhankelijkheden, risico's) and a Key Result grounded in something already in the repo — the load-test dataset, the audit tables, the design-system lint gate.

3. Top-down: 10 state:decompose items became epics

672 first (its five-slice plan had been sitting unexecuted in a comment since 5 August), then #699,

843, #939, #676, #207, #723, #875, #934, #837, plus a new governance epic #1139 and, later,

1140/#1141/#1142 and #673.

31 new slice issues. Only the first slice of each epic carries enhancement; the rest wait.

4. Prioritisation

Driver (7 values, ranked) and Effort (S/M/L) on both boards. Effort was deliberately split from Driver: "too easy not to do" is a cost, not a reason, and must cut across every driver.

5. Conflict round

Four parallel agents read every epic's children together, including what sits in open PRs. Results posted as one comment per epic; 14 decision issues created with native blocked by links to the 30 features they block.

Corrections made along the way

Recorded because the pattern matters more than the individual errors — several were mine, found by the conflict round.

#1104's Key Result did not match its children. It measured 8 Low/Info items from the maintenance audit; #783/#784/#785 are Medium items from a different document, and L-8's issue was closed as NOT_PLANNED corrected in the epic body
#1106's Key Result was unachievable. It demanded "same semantics as other rights"; #921 deliberately does the opposite (query-time, opt-in, I badges). Its second half was measured by work parked in another epic corrected
#1107 invented a hard dependency its own child denies. The epic said "#939 → #940 is hard"; #940 says "Independent of #939… not a hard dependency" corrected
#672 repeated a wrong cross-reference. The DoR comment claimed #935 touches org-risk config; #935 is a natural-language chat interface. It was gating slice 3 for no reason corrected
#699's Key Result was unachievable as scoped. "No db.query outside src/data/" — but 38 non-route files call it, including perf/sqlTimer.js which defines timedQuery became decision #1150
Three features were placed on their title, not their content. #680 is the Users list page, not the matrix. #84 is a per-page export button, not a report. #687 belongs with #679 (same file) re-parented
Three auto-update slices were parked on a blocker that no longer existed — the blocked-external label had been removed by the epic conversion itself corrected

Lessons worth keeping

issues.edited is an agent trigger. Correcting placeholder issue numbers after creation cost one extra AI run per slice. Write slice bodies without sibling numbers; let the sub-issue relation carry the ordering.

dor-blank-triage catches everything without enhancement/bug — including every epic and decision issue, applying needs-triage plus three assignees. Predicted the dor-triage behaviour correctly and missed this one entirely.

Board #4's "auto-add sub-issues" workflow pulls all children onto the epic board on every new link. No API to disable it.

gh project field-create does not set colours; the GraphQL mutation does. Changing options regenerates their IDs, so every value has to be re-set afterwards.

Verify before asserting. Two claims that survived checking (the umbrellas #777/#787 genuinely cannot be split — their content is withheld in reports kept outside the repo) and one that did not (the audit status tables are stale: #758 is closed while the table still says open, and two epic Key Results are measured against those tables).

Interview outcomes (2026-09-08)

Four deviations from the Fortigi approach, now deliberate rather than accidental:

Flow, no sprints Product development is not a customer implementation
Epics are the objectives No separate layer above them; niveau 2 and 3 merge; Driver becomes the portfolio view
One fixed review moment, all Key Results at once — monthly Not a date per KR. Owner and first date still to set
The autonomy ladder is vocabulary, not mechanism Voordoen → Loslaten maps onto 🟡/🟢/autobuild, but no field is built for it

Features flow; the review layer has a cadence. The approach's "fixed rhythm without breaking governance" applies here at the epic layer rather than the feature layer.

Review outcome (2026-09-08)

Two objections came back from review, and they turned out to be the same problem.

On the levels. "An epic is a goal with features under it that contribute to reaching it. What you call Epics are Features, and what hangs under them are stories." Counted: 13 of 22 are goal-shaped, 9 are features with implementation slices — the split runs exactly along bottom-up versus top-down. One word had been used for two operations without the difference ever being named.

On the status field. "An epic cannot be ready to build; a feature can." Correct, and the cause was putting two kinds of value in one field — one intrinsic to the parent (Conflict, Ontwerp open), one a roll-up of the children that GitHub already displays natively.

Why they are one problem. The evaluation above answered "is the Effect layer covered?" with "yes — the epics are the objectives". That premise holds for 13 and not for 9, which is why the answer felt right and read wrong. All three of the approach's tiers already exist here; only the top two shared a name.

Resolution: type it, do not move it. Add Issue Types Epic and Slice; re-parent nothing. Grouping and conflict detection are level-agnostic — they work because things that must be judged together sit together — so nothing built this session is lost. Steps A and B in autonomy-roadmap.md.

And the part the naming does not fix: the review cadence is agreed (monthly) but no Key Result has ever actually been measured, and nobody owns the review. Of the two objections and the gap they exposed, that is the one worth the most.

State on close

22 epics · 67 features with a parent · no:parent-issue = 0 · 14 decision issues · 30 blocked by · 10 epics on Conflict · 4 items left on state:decompose (two umbrellas that cannot be split from repo content, correctly).

Most urgent: #937 is at awaiting-approval and is blocked by two open decisions (#1147, #1149). Approving it before those close builds the contradiction in.